The Maintenance Data page defines use-stage maintenance and repair costs for the economic pillar, carbon emission costs linked to maintenance activities for the environmental pillar, and closure durations that drive road user costs during major repair and bearing replacement for the social pillar. All percentage-based costs are applied against totals computed from Construction Work Data and Carbon Emissions Data when Calculate is run.

Click Maintenance Data in the left navigation menu (listed as Maintenance and Repair under Input Parameters). The page contains four form sections, action buttons (Load Suggested Values, Clear All), and inline ⓘ documentation links on each field.


F.1 Overview of the Maintenance Data page​

The form is organised into four sections on a single scrollable page:

SectionPurpose
Routine MaintenanceAnnual-style inspection cost and interval
Periodic MaintenancePeriodic upkeep cost, linked carbon cost, and interval
Major WorksMajor inspection and major repair - each with cost, interval, and (for repair) duration
Bearings & Expansion JointsReplacement cost, interval, and on-site duration

Major Works appears in the UI as two consecutive section headers: Major Inspection and Major Repair.

[TODO - screenshot not yet available: documentation_images/partF/01_maintenance_data_overview.png]


F.2 Routine Maintenance​

Section Routine Maintenance contains two fields that schedule routine bridge inspections over the design life.

F.2.1 Field reference​

FieldRequiredInput rangeUnitDescription
Routine Inspection CostYes0.000–100.000(% of initial construction cost)Inspection expenditure expressed as a percentage of initial construction cost (from Construction Work Data).
Routine Inspection FrequencyYes0–50(year)Interval between routine inspections, in years.

Each field label is followed by helper text and an ⓘ link that opens the in-app field documentation.

F.2.2 Role in LCCA​

Output (Results)Pillar
Routine Inspection CostsEconomic - use stage

The cost percentage and frequency are combined with design life and Financial Data discounting to produce a present-value total at each inspection interval.


F.3 Periodic Maintenance​

Section Periodic Maintenance defines recurring upkeep beyond routine inspection, including an environmental cost component.

F.3.1 Field reference​

FieldRequiredInput rangeUnitDescription
Periodic Maintenance CostYes0.000–100.000(% of initial construction cost)Periodic maintenance expenditure as a percentage of initial construction cost.
Periodic Maintenance Carbon CostYes0.000–100.000(% of initial construction cost)Carbon emission cost of periodic maintenance as a percentage of initial carbon emissions cost (from Carbon Emissions Data). The unit suffix matches other cost fields; the helper text defines the carbon basis.
Periodic Maintenance FrequencyYes0–100(year)Interval between periodic maintenance events, in years.

F.3.2 Role in LCCA​

Output (Results)Pillar
Periodic Maintenance CostsEconomic - use stage
Periodic Maintenance related Carbon EmissionsEnvironmental - use stage

[TODO - screenshot not yet available: documentation_images/partF/02_periodic_carbon_basis.png]


F.4 Major Works​

Major Works covers major inspection and major repair activities. The UI renders these as two separate section headers on the same page.

F.4.1 Major Inspection​

FieldRequiredInput rangeUnitDescription
Major Inspection CostYes0.000–100.000(% of initial construction cost)Cost of a major inspection event as a percentage of initial construction cost.
Major Inspection FrequencyYes0–100(year)Interval between major inspections, in years.
Output (Results)Pillar
Major Inspection CostsEconomic - use stage

F.4.2 Major Repair​

FieldRequiredInput rangeUnitDescription
Major Repair CostYes0.000–100.000(% of initial construction cost)Cost of a major repair event as a percentage of initial construction cost.
Major Repair Carbon CostYes0.000–100.000(% of initial construction cost)Carbon emission cost of major repair as a percentage of initial carbon emissions cost.
Major Repair FrequencyYes0–100(year)Interval between major repair events, in years.
Major Repair DurationYes0–60(months)Duration of major repair works on site, in months. Used to compute road user and rerouting carbon costs when Traffic Data is populated.
Output (Results)Pillar
Major Repair CostsEconomic - use stage
Major Repair related Carbon EmissionsEnvironmental - use stage
Carbon Emissions due to Rerouting during Major RepairsEnvironmental - use stage
Road User Costs during Major RepairsSocial - use stage

[TODO - screenshot not yet available: documentation_images/partF/03_major_works.png]


F.5 Bearings & Expansion Joints​

Section Bearings & Expansion Joints defines replacement of bearings and expansion joints over the bridge life.

F.5.1 Field reference​

FieldRequiredInput rangeUnitDescription
Bearing & Expansion Joint Replacement CostYes0.000–100.000(% of initial construction cost)Replacement cost expressed as a percentage of superstructure cost (Super-Structure tab total from Construction Work Data). The unit suffix shows construction cost; the helper text and calculation engine use the superstructure total.
Bearing & Expansion Joint Replacement FrequencyYes0–100(year)Interval between replacement events, in years.
Bearing & Expansion Joint Replacement DurationYes0–365(days)On-site duration of replacement works, in days. Used for road user and rerouting carbon costs during replacement.

F.5.2 Role in LCCA​

Output (Results)Pillar
Replacement Costs of Bearings and Expansion jointsEconomic - use stage
Carbon Emissions due to Rerouting during Replacement of Bearings and Expansion jointsEnvironmental - use stage
Road User Costs during Replacement of Bearings and Expansion jointsSocial - use stage

[TODO - screenshot not yet available: documentation_images/partF/04_bearings_expansion_joints.png]


F.6 Load Suggested Values​

Click Load Suggested Values to fill all maintenance fields on this page with built-in defaults. The button resets validation highlighting on filled fields and marks the page as changed (autosaved when the project is saved).

Fields on other pages (for example Demolition Data) are not modified - keys without a widget on this page are skipped silently.

Values applied by Load Suggested Values:

FieldValue
Routine Inspection Cost0.100 %
Routine Inspection Frequency1 year
Periodic Maintenance Cost0.550 %
Periodic Maintenance Carbon Cost0.550 %
Periodic Maintenance Frequency5 years
Major Inspection Cost0.500 %
Major Inspection Frequency5 years
Major Repair Cost10.000 %
Major Repair Carbon Cost0.550 %
Major Repair Frequency20 years
Major Repair Duration3 months
Bearing & Expansion Joint Replacement Cost12.500 %
Bearing & Expansion Joint Replacement Frequency25 years
Bearing & Expansion Joint Replacement Duration2 days

These defaults are starting points for Indian public-infrastructure style bridge studies. Replace them with project-specific or agency-approved values before final reporting.

[TODO - screenshot not yet available: documentation_images/partF/05_after_load_suggested.png]


F.7 Clear All​

Click Clear All. A confirmation dialog asks whether to reset all fields on this page.

On confirmation:

  • All numeric fields return to their minimum (0)
  • Validation highlighting is cleared
  • The page is marked as changed

Clear All affects only the Maintenance Data page. It does not change Demolition Data, Construction Work Data, or other sections.


F.8 Validation​

Validation runs when Calculate is clicked. All 14 fields are required. Results are errors (blocking) and warnings (non-blocking but highlighted).

F.8.1 Required-field errors​

A spin box still at its minimum value (0) is treated as unset because 0 is the field default.

ConditionResult
Any maintenance field left at 0 (initial default)Error: '<field title>' is required - enter a value above the minimum - red border
User enters any value above the minimumRequired check passes for that field

Click Load Suggested Values after creating a new project to satisfy all required fields in one step.

F.8.2 Range warnings​

Values outside typical ranges trigger an orange warning border and a verification message. Warnings do not block calculation by themselves; the app prompts for confirmation when warnings are present.

Cost fields (all *_cost keys): warning when value < 0.01 or > 100.00.

FieldMessage when < 0.01
Routine Inspection CostRoutine Inspection Cost is 0 - cost will not be included
Periodic Maintenance CostPeriodic Maintenance Cost is 0 - cost will not be included
Periodic Maintenance Carbon CostPeriodic Maintenance Carbon Cost is 0 - cost will not be included
Major Inspection CostMajor Inspection Cost is 0 - cost will not be included
Major Repair CostMajor Repair Cost is 0 - cost will not be included
Major Repair Carbon CostMajor Repair Carbon Cost is 0 - cost will not be included
Bearing & Expansion Joint Replacement CostBearing & Expansion Joint Cost is 0 - cost will not be included

Frequency fields: warning when value < 1 or above the section maximum.

FieldValid range (no warning)Message when out of range
Routine Inspection Frequency1–50 yearsRoutine Inspection Frequency seems unusual - expected between 1 and 50 years
Periodic Maintenance Frequency1–100 yearsPeriodic Maintenance Frequency seems unusual - expected between 1 and 100 years
Major Inspection Frequency1–100 yearsMajor Inspection Frequency seems unusual - expected between 1 and 100 years
Major Repair Frequency1–100 yearsMajor Repair Frequency seems unusual - expected between 1 and 100 years
Bearing & Expansion Joint Replacement Frequency1–100 yearsBearing & Expansion Joint Frequency seems unusual - expected between 1 and 100 years

Duration fields: warning when value < 1 or above the section maximum.

FieldValid range (no warning)Message when out of range
Major Repair Duration1–60 monthsMajor Repair Duration seems unusual - expected between 1 and 60 months
Bearing & Expansion Joint Replacement Duration1–365 daysReplacement Duration seems unusual - expected between 1 and 365 days

[TODO - screenshot not yet available: documentation_images/partF/06_validation_warning.png]


F.9 Example values - Sone River Road Bridge​

For the guide example (India, INR, 50-year design life, 2024 construction), use either Load Suggested Values or enter the following explicitly:

Routine Inspection Cost : 0.100 %
Routine Inspection Frequency : 1 year

Periodic Maintenance Cost : 0.550 %
Periodic Maintenance Carbon Cost : 0.550 %
Periodic Maintenance Frequency : 5 years

Major Inspection Cost : 0.500 %
Major Inspection Frequency : 5 years

Major Repair Cost : 10.000 %
Major Repair Carbon Cost : 0.550 %
Major Repair Frequency : 20 years
Major Repair Duration : 3 months

Bearing & Expansion Joint Replacement Cost : 12.500 %
Bearing & Expansion Joint Replacement Frequency : 25 years
Bearing & Expansion Joint Replacement Duration : 2 days

Ensure Construction Work Data (especially Super-Structure) and Carbon Emissions Data are populated before Calculate. Percentage-based maintenance costs are derived from those totals.


F - Screenshot checklist​

Checklist ItemFile
Maintenance Data - Overview (annotated)documentation_images/partF/01_maintenance_data_overview.png
Periodic Maintenance - carbon cost basis (annotated)documentation_images/partF/02_periodic_carbon_basis.png
Major Works - inspection and repair (annotated)documentation_images/partF/03_major_works.png
Bearings & Expansion Joints (annotated)documentation_images/partF/04_bearings_expansion_joints.png
After Load Suggested Values (annotated)documentation_images/partF/05_after_load_suggested.png
Validation warning (annotated)documentation_images/partF/06_validation_warning.png