Skip to main content

Concepts

The three pillars​

3psLCCA quantifies bridge life cycle impacts across three pillars, all expressed in a common monetary metric so that alternatives can be compared directly:

PillarCaptures
EconomicDirect financial costs: construction, operation, inspection, maintenance, rehabilitation, hazard-induced repair, decommissioning
EnvironmentalImpacts such as carbon emissions, converted to monetary terms
SocialUser-related costs, e.g. disruption from lane closures, delays, and detours

Life cycle stages​

A bridge assessment in 3psLCCA is broken down by stage:

  • Construction - initial build cost and embodied impacts.
  • Operation & inspection - routine monitoring costs over the service life.
  • Maintenance - scheduled upkeep.
  • Rehabilitation - major interventions to restore performance.
  • Hazard-induced repair - repairs following earthquakes or other extreme events.
  • Decommissioning - end-of-life removal/disposal.

Regional databases​

3psLCCA ships with a default database calibrated for India, covering material, labor, and process costs typical of steel and PSC girder short-span bridges. Users can define project-specific parameters or import a database for another region, and the modular architecture is intended to extend to additional bridge typologies and span ranges over time.